机械完工、预试车、试车、开车及验收程序

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有账号?立即注册

x
回复

使用道具 举报

已有16人评论

碧落春 发表于 2023-9-13 22:23:56
thanks for your sharing
回复

使用道具 举报

tian88888sen 发表于 2023-9-14 12:36:46
The intention of this script is to define the transition from Construction Phase to Production Phase in a project.本文件的目的旨在定义一个项目从施工阶段向生产阶段的过渡。
It comprises the summary of procedures, which have to be completed as well as the allocation of responsibilities for these procedures between Owner and Contractor. Allocation of responsibilities has to be defined for each individual project depending on type of project and contract. 它包括必须完成程序的概要以及这些程序在业主与承包商之间的责任分配。必须按项目类型与合同对各项目的责任分配进行定义。
Acceptance Of The Plant may occur at any milestones as described hereafter. In this procedure it is assumed that the Acceptance Of The Plant will be after the Performance Test. If this is not the case, this work procedure should be adapted accordingly.装置验收有可能在下文所述的任何一个里程碑发生。在本程序中,假定装置验收在性能考核之后。如果不是这样,本工作程序应进行相应地修改。
The Contractor shall prepare a detailed test plan and schedule.承包商应准备一份详细的试验方案与时间进度表。
回复

使用道具 举报

yilong685 发表于 2023-9-18 20:29:25
很不错很不错
回复

使用道具 举报

hlgdj 发表于 2023-9-20 06:15:29
这个很不错,把验收程序规范化了,谢谢
回复

使用道具 举报

jisx0404 发表于 2023-9-21 20:29:41
这个有用,我要支持。但是下不了。
回复

使用道具 举报

蓝冰渚 发表于 2023-9-23 07:19:14
好像不太全啊,技术要求太少了
回复

使用道具 举报

墨莲 发表于 2023-9-25 19:01:58
非常很好呀
回复

使用道具 举报

zgssd 发表于 2023-9-27 22:06:09
相当有用的资料.把各个程序都规范的很清楚.检验有序可查.
回复

使用道具 举报

kiven.chen 发表于 2023-9-28 10:43:06
全面啊
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

QQ| Archiver|手机版|小黑屋| 碧波制图网 Published by Stonespider

Copyright © 2021-2023 Kangli Wu   All Rights Reserved.

Powered by Discuz! X3.4( 苏ICP备18011607号-1 )

快速
回复
返回
列表
返回
顶部